National Rail Passenger Survey Autumn 2014 (published 2015)

Fieldwork for Wave 31 was undertaken between 1st September and 9th November 2014. Govia Thameslink Railway took over the franchise previously operated by First Capital Connect on 14th September 2014. This meant that fieldwork at stations operated by Govia Thameslink Railway, as well as shifts involving passengers travelling on Govia Thameslink Railway did not start until that date. Due to some additional booster samples being commissioned after the main survey fieldwork had begun, a small amount of fieldwork overran by a few days, ultimately extending the fieldwork period for some boost samples until 13th November; this affected boost samples only and not the main survey, results of which are shown in this report. As with previous waves, planned and unplanned engineering works/problems meant that some other shifts were also rescheduled (this particularly affected shifts during weekends). As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still train services running

The Passenger Survey from Passenger Focus is attached as pdf files for both Govia Thameslink (use Great Northern data) and Abellio Greater Anglia (use West Anglia Inner data)

Views: 44

Attachments:

Reply to This

Connecting the communities of Bowes Park and Bounds Green in north London.

Featured Content

Translate this website

© 2025   Created by Richard McKeever.   Powered by

Badges  |  Report an Issue  |  Terms of Service

Related Posts Plugin for WordPress, Blogger...